How FDR works
146 Add:08-10-2024
  Generally, the FRD process including below phases

  
  1.Pulverization: The existing asphalt pavement and a portion of the underlying materials (like base and subgrade) are pulverized and mixed together. This process usually goes down to a depth of 4 to 12 inches, depending on the project requirements.
  
  2.Addition of Stabilizing Agents: After pulverization, various stabilizing agents like cement, lime, or bitumen emulsion may be added to the mixture. These agents help to bind the materials together and enhance the structural integrity of the new base.
  
  3.Compaction: The recycled material, now treated and stabilized, is compacted to create a new base layer. This layer is then ready for the application of a new surface course, like asphalt or concrete.
  
  4.Surfacing: Finally, a new asphalt or concrete surface is applied over the compacted base, completing the road rehabilitation process.
  
  In step1 and steps, we have large job site feedback and continuous improvement to our machines, so works with our Cold Recyclers, we can see reliable performance.   We also have machine with function of Recycling with Pre-Spread Cement and Bitumen Emulsion , any enquiry, please contact us.
MuellertekProduct usage video
The video below shows the entire process of FDR road construction using our cold recycling machine